Amenity watch: The break out spaces at new St Kilda Road apartment development, 333 StK

Construction, led by Balmain & Co, is on track for completion in Q4 2025
Amenity watch: The break out spaces at new St Kilda Road apartment development, 333 StK
Urban EditorialFebruary 22, 2024AMENITY WATCH

Future residents at Matrix Development Pty Ltd's 333 STK will enjoy their well-designed apartments with a well-rounded lifestyle, thanks to a variety of on-site amenities and facilities.

The Rothelowman-designed 333 Stk, named after its premium location at 333 St Kilda Road, comprises 76 one, two, and three-bedroom apartments, including two two-level penthouses. 

The apartments are elevated above a podium featuring two retail spaces anticipated to house a mini grocer and a specialty bakery cafe.

Some units feature winter gardens or outdoor terraces, providing flexible spaces for personal studies or hobbies.

Communal areas include a fully appointed private dining room, perfect for hosting long lunches or dinner parties. 

The multifunctional lounge serves as a media room, conference, and meeting space, catering to both business and relaxation needs.

The crowning feature of 333 STK is the rooftop retreat, offering panoramic views across St Kilda, complemented by a built-in barbecue and comfortable seating areas.

There's also a fully equipped gym exclusively for residents use.

Sustainability is a priority at 333 STK, with 100 per cent renewable energy provided in each home. Energy-efficient appliances, 4 to 5-star WELS Tapware, and ultra-low Volatile Organic Compounds Interior (VOC) paint contribute to environmentally conscious living.

All apartments include one or two parking spaces, with provisions for electric vehicle (EV) charging stations and lockable storage areas.

Strategically located on a 2,540 sqm corner site along St Kilda Road and Blanche Street, 333 STK places residents in proximity to various local amenities, such as St Kilda Beach, St Kilda Esplanade Market, The Avenue Hospital, St Kilda Park Primary School, St Mary College, St Kilda Botanical Garden, and Luna Park.

Construction, led by Balmain & Co, is on track for completion in Q4 2025. Prospective buyers can capitalise on stamp duty savings available now.

Editor's Picks

TOGA installs first tower crane at Macquarie Rise as construction gathers pace
Olympic infrastructure fuels residential boom in Maroochydore City Centre
Australian Federal Election 2025: How Labor and Liberal plan to fix the housing crisis
First certified Passivhaus homes in Australia complete in Hawthorn
Figurehead covers stamp duty at Osprey Safety Beach in pre-Easter sales offer