Track progress updates
1-3 Maher Street, Caboolture QLD 4510
1-3 Maher Street, Caboolture QLD 4510
Residences
24
Estimated Completion Date
2026
Building Type
Low-Rise
Floor Count
2
This development isn’t being actively monitored by the developer
If this is your development, claim your listing
If this is your development, claim your listing
1-3 Maher Street, Caboolture QLD 4510
Development information for 1-3 Maher Street, Caboolture QLD 4510
- Reconfiguration of one lot into two separate lots
- Construction of 4 x 2 storey residential buildings with a total of 24 apartments
- Stage 1 includes apartments 1-6 on Building 1 and apartments 7-12 on Building 2
- Stage 2 includes apartments 13-18 on Building 3 and apartments 19-24 on Building 4
- Each building has two levels, with level 1 consisting of one 2-bedroom and one 3-bedroom apartment, and level 2 consisting of one 2-bedroom and three 3-bedroom apartments
- The exterior of the buildings will feature powder-coated aluminum joinery, rendered and weatherboard cladding, face brickwork walls, and color-coated metal roof sheeting
- The development will provide 40 residential and 8 visitor car parking spaces for a total of 48 vehicles
Development information for 1-3 Maher Street, Caboolture QLD 4510
Suburb:
Project Status:
Construction Commenced
Estimated Completion Date:
2026
Residences:
24
Car Spaces:
48
Buildings:
1
Building Type:
Low-Rise
Floors:
2